CFRP composite system-The main bridge of jiangsu section irrigation canal bridge

carbon fiber strengtheing

General situation of Engineering

The maintenance renovation of the irrigation canal bridge of the North Jiangsu Expressway has been the first maintenance since the bridge was opened to traffic in December 8, 2000. In order to ensure the normal, safe and smooth transportation of this important north-south highway, the bridge maintenance repair project adopts non closed construction method with a construction period of 1 months.


Reinforcement time


carbon fiber strengthening


September 2014


Reinforcement method

Strengthening method by bonding carbon CFRP


Material selection

HM carbon fiber cloth, HM carbon fiber glue


carbon fiber


Các Sản Phẩm Được Sử Dụng Trong Dự Án NàyNhững người đã xem dự án này cũng quan tâm đến những sản phẩm sau:

Back
Top
Close