Before cracks are repaired, we need to measure the cracks first and choose the appropriate method according to the width of the cracks. When the crack width is less than 0.2mm, the crack repair glue is closed. When the crack width is in the 0.2mm~1.5mm, the crack injection adhesive should be injected into the fracture cavity with a certain pressure to strengthen and close the fracture cavity.

Concrete cracks are one of the most common diseases in the building structure. If they do not deal with the cracks which affect the structure safety, it will cause irreversible damage to the building. Then, when the cracks are repaired, what are the construction precautions?
Before cracks are repaired, we need to measure the cracks first and choose the appropriate method according to the width of the cracks. When the crack width is less than 0.2mm, the crack repair glue is closed. When the crack width is in the 0.2mm~1.5mm, the crack injection adhesive should be injected into the fracture cavity with a certain pressure to strengthen and close the fracture cavity. When the crack width is greater than 1.5mm, the pressure grouting method should be adopted.
If there is a slight leakage during construction, temporary plugging measures such as water glass and cement can be adopted, but the quality will be affected. This is not the case in general, but the relevant solutions must be understood.

The grouting pressure should gradually increase. If not gradually increasing, it will cause the following conditions: easy to break the weak point of the closed layer, to re fill the seal or cause the leakage of slurry, and also easily make the slurry flow too fast in the gap to form short circuit, the air can not be discharged and cause the lack of slurry and bubbles.
When the temperature is higher, outdoor construction is best in the morning or evening. If there is a need for construction under high temperature conditions, proper cooling can be carried out. If the cracks are wider, a little talcum powder can be added to the slurry or the amount of diluent in the formula can be reduced. Late inspection is also very important. We need to strictly check every process and record relevant details.
The construction environment should be dry and ventilated. The paste surface should be clean, dry and without oil; the curing temperature should not be less than 5 C, and the curing time can be adjusted according to the specific use.
The construction personnel should take necessary safety precautions, such as wearing masks, gloves, goggles and so on. If the structure glue is not careful to hurt the skin or clothing, it can be immediately cleaned with acetone and rinsed with plenty of water. If you accidentally eat or splash your eyes, you should seek medical attention immediately.
Bạn có thể tìm thấy mọi thứ bạn cần ở đây. Hãy tin tưởng và thử nghiệm các sản phẩm này, bạn sẽ thấy sự khác biệt lớn sau đó.
Lớp bọc sợi carbon đơn hướng, cường độ cao được bão hòa trước để tạo thành lớp bọc polyme gia cường sợi carbon (CFRP) dùng để gia cố các cấu kiện bê tông kết cấu.
Keo dán bịt vết nứt HM-9 là keo dán nhựa epoxy biến tính hai thành phần, thường được sử dụng với keo dán nứt đổ để bịt vết nứt và cố định vòi phun.
Keo phun vết nứt bê tông Horse HM-120L là loại keo epoxy dùng để sửa chữa vết nứt bê tông bằng cách tiêm. Keo epoxy có tính thẩm thấu cao. Tiêm vết nứt ở áp suất thấp trong bê tông kết cấu.