Reinforcement steel bar pull-out test

The tensile test of steel bar is the field test of the anchoring force. After 48-72 hours of rebar planting, the tension meter (Jack) can be used to carry out the drawing test of the reinforced bar.

Reinforcement steel bar pull-out test

The tensile test of steel bar is the field test of the anchoring force. After 48-72 hours of post installed anchoring, the tension meter (Jack) can be used to carry out the drawing test of the reinforced bar.


Experimental steps


1. In general, 72 hours after planting steel bar, the pulling force test of the steel bar can be carried out by the force meter (Jack). In order to reduce the confinement of the jack to the concrete near the anchor bar, it is installed under the channel steel or scaffold. The fulcrum distance is more than max (3D, 60mm). Then uniform loading for 2 to 3 minutes (or step loading) until failure.

  Failure modes are divided into

  • Reinforcement damage (bar breaking),

  • Section failure of reinforcing bar (steel bar pulls out along structural adhesive and steel bar).

  • Mixed damage (the upper part is concrete cone damage, and the lower part is pulled out along the structural glue and concrete interface).

The structural member's failure mode should be controlled by steel bar breaking.


2.For non-destructive testing, the maximum loading value is 0.95Asfyk.


3.The quantity of sampling can be determined by 0.1% of the amount of planted bars, but not less than 3.


4.The following two loading systems can be used for anchor bolt pull test: continuous loading, loading at constant speed to setting load or anchoring failure, and the total loading time is 2min~3min.


Các Sản Phẩm Được Gợi Ý của Horse Construction

Bạn có thể tìm thấy mọi thứ bạn cần ở đây. Hãy tin tưởng và thử nghiệm các sản phẩm này, bạn sẽ thấy sự khác biệt lớn sau đó.

Keo Epoxy neo HM-500T

Keo Epoxy neo Horse HM-500T là vật liệu neo hiệu suất cao, gốc nhựa epoxy, có tính lưu biến, 2 thành phần dành cho thanh và cốt thép, thích hợp sử dụng trong bê tông khô và ẩm.

Thêm >

Back
Top
Close