Key points of FRP composite strengthening​

​Before FRP composite strengthening, please reconfirm whether the concrete repair surface is clean and no foreign matter. After confirmation, make sure that the bottom glue is evenly applied on the top and bottom glue, otherwise there will be bubbles in the later carbon fiber composite materials.

FRP composite strengthening

Experience summary: key points of fiber reinforced polymer(FRP) composite strengthening


Before FRP composite strengthening, please reconfirm whether the concrete repair surface is clean and no foreign matter. After confirmation, make sure that the bottom glue is evenly applied on the top and bottom glue, otherwise there will be bubbles in the later carbon fiber composite materials.


In order to prevent carbon fiber composite materials damaged, steel ruler and wallpaper knife are used to cut off carbon fiber composite materials according to the specified size in the process of transportation, storage, cutting and pasting of carbon fiber material, and the length of each segment is generally not more than 6 m. In order to prevent material from being damaged during storage, the number of materials should be cut according to the amount of the day. The carbon fiber longitudinal joint must be lapped over 20cm. The area should be coated with resin, and the transverse carbon fibers need not be lapped.


Carbon fiber glue AB component should be accurately weighed according to the prescribed proportion, into the container, stirred evenly with a stirrer. A harmonic quantity should be used within the available time.


FRP composite strengthening

When carbon fiber fabric is pasted, do not have any air between carbon fiber fabric and carbon fiber adhesive. Special tools can be used along the fiber direction and rolling many times, so that resin immersion in carbon fiber fabric.


After curing and pasting the FRP composite material, it should be naturally cured for 1-2 hours to reach the initial curing stage. It should be guaranteed that the curing period is free from external interference and collision.


If reinforced components need fire protection, they can be painted with fireproof coating after curing. Painting shall be carried out at the initial curing stage of the resin and shall comply with the relevant standards and construction requirements for the coatings used.


Các Sản Phẩm Được Gợi Ý của Horse Construction

Bạn có thể tìm thấy mọi thứ bạn cần ở đây. Hãy tin tưởng và thử nghiệm các sản phẩm này, bạn sẽ thấy sự khác biệt lớn sau đó.

Sợi carbon đơn hướng HM-20

Lớp bọc sợi carbon đơn hướng, cường độ cao được bão hòa trước để tạo thành lớp bọc polyme gia cường sợi carbon (CFRP) dùng để gia cố các cấu kiện bê tông kết cấu.

Thêm >

Keo sợi carbon HM-180C3P

Keo dán sợi carbon tẩm tốt để ứng dụng polyme gia cường sợi carbon (CFRP) để gia cố kết cấu

Thêm >

Tấm sợi carbon đơn hướng HM-1.2T

Dải / tấm polyme gia cường sợi carbon (CFRP) cường độ cao để gia cố kết cấu và sửa chữa bê tông

Thêm >

Back
Top
Close